You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan Modular Tank di Green Garden Rampung

Green Garden Infiltration Wells Construction Estimated to Finish Within a Week

In a week, modular tank infiltration wells construction carried out on Jl. Kompleks Green Garden Blok L, RT 12/04, Kedoya Utara, Kebon Jeruk, West Jakarta will be completed.

Since this is the final touch, we estimate it to finish within a week

Kebon Jeruk Sub-district Water Resources (SDA) Unit Head, Suprapto stated, infiltration well construction whad been started since November 14. Infiltration wells were built along 100 meters with capacity of 300 cubic meters.

"Since this is the final touch, we estimate it to finish within a week," he said, Thursday (12/17).

92 Infiltration Wells Built in West Jakarta

His side deployed 7 SDA Unit personnel to build it. Infiltration well has size of 4 meters long, 3 meters wide, and 1.5 meters deep. Each of them installed with 54 modular tanks.

"The advantages of infiltration wells with modular tanks are lighter, faster to build, don't need heavy equipment, have stronger structure and don't need maintenance," he conveyed.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1046 personFakhrizal Fakhri
  2. Jakarta Government Prepares Rp 249 B to Renovate Four Schools

    access_time25-07-2026 remove_red_eye882 personDessy Suciati
  3. Rano Urges Jakarta Scouts to Be Active in Waste Sorting Movement

    access_time25-07-2026 remove_red_eye700 personAldi Geri Lumban Tobing
  4. Pramono Encourages Residents to Stay Active at Rasuna Said CFD

    access_time26-07-2026 remove_red_eye630 personFolmer
  5. Jakarta Steps Up Food Waste Prevention

    access_time25-07-2026 remove_red_eye585 personAldi Geri Lumban Tobing