You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan Modular Tank di Green Garden Rampung

Green Garden Infiltration Wells Construction Estimated to Finish Within a Week

In a week, modular tank infiltration wells construction carried out on Jl. Kompleks Green Garden Blok L, RT 12/04, Kedoya Utara, Kebon Jeruk, West Jakarta will be completed.

Since this is the final touch, we estimate it to finish within a week

Kebon Jeruk Sub-district Water Resources (SDA) Unit Head, Suprapto stated, infiltration well construction whad been started since November 14. Infiltration wells were built along 100 meters with capacity of 300 cubic meters.

"Since this is the final touch, we estimate it to finish within a week," he said, Thursday (12/17).

92 Infiltration Wells Built in West Jakarta

His side deployed 7 SDA Unit personnel to build it. Infiltration well has size of 4 meters long, 3 meters wide, and 1.5 meters deep. Each of them installed with 54 modular tanks.

"The advantages of infiltration wells with modular tanks are lighter, faster to build, don't need heavy equipment, have stronger structure and don't need maintenance," he conveyed.

Linked News
Popular News indeks
  1. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1562 personFakhrizal Fakhri
  2. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1176 personFakhrizal Fakhri
  3. Commission E Enlists Religious Leaders to Fight Drugs and Violence

    access_time24-07-2026 remove_red_eye1162 personFakhrizal Fakhri
  4. Fire at Spark Sport Academy Pondok Bambu Successfully Extinguished

    access_time20-07-2026 remove_red_eye1002 personNurito
  5. The 2026 SEA V Cup Officially Begins

    access_time23-07-2026 remove_red_eye809 personAldi Geri Lumban Tobing